7 firms in the race to construct the underground section of Agra Metro Phase-I

According to tender documents, the assigned contractor will be required to install only three boreholes (TBMs)

1
4264
7 firms in the race to construct the underground section of Agra Metro Phase-I
Image for representation. Photo Copyright: Bombardier India
Advertisement

AGRA, INDIA (Metro Rail News): Seven firms have submitted tenders to construct the Agra Metro Phase-I (AGCC-02) underground between the RBS College Ramp and the Taj Mahal Ramp after the Uttar Pradesh Metro Rail Corporation Ltd. (UPMRCL) opened technical bids today.

This 7.93 km package from chainage 3630 to 11564.485 contains two tunnels connecting seven Taj Mahal, Agra Fort, Jama Masjid, SN Medical College, Agra College, Raja ki Mandi and RBS College.

According to tender documents, the assigned contractor will be required to install only three boreholes (TBMs).

UPMRC has invited bids for this package in August 2021 at an estimated cost of Rs. 2200 crore and four-year completion deadline. The contract will be funded by the European Investment Bank (EIB) with a debt of 480 million Euros (approx..) loan.

Contestants:

· Afcons Infra – SAM India JV

· DRA – Evrascon JV

· J Kumar Infra – NCC JV

· JMC Projects – CAI JV

· Larsen and Toubro (L&T)

· Gulermak

· ITD Cementation India

Package: AGCC-02

Project’s Scope: Design and Construction of the Tunnel from the beginning of the subway (near Fatehabad Road Metro station) to the end of the ramp after the RBS College Metro station, which includes seven municipal underground stations (i.e., Taj Mahal, Agra Fort, Jama Masjid, SN Medical College, Agra College, Raja ki Mandi and RBS college) which includes Architectural finishes, E&M, TVs, ECS etc. Corridor-1 of the Agra MRTS Project in Agra, Uttar Pradesh, India.

Daily Updates from Metro & Railway

1 COMMENT

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.