Delhi Metro: Information, Route Maps & Projects Updates

General Information  Latest Project Updates

Overview
Delhi Metro Rail Corporation Limited (DMRC) is a Special Purpose Vehicle (SPV) entrusted with the responsibility of implementation of Delhi Metro Rail Project. DMRC was registered on 3rd May 1995 under the Companies Act, 1956 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Government of India.

Operational Lines (Phase-I, II & III Network)230.18 km

  • Red Line#1 (Dilshad Garden – Rithala) – 25.09 (21 Stations)
  • Yellow Line#2 (Samaypur Badli – HUDA City Centre) – 49.31 (37 Stations)
  • Blue Line#3 (Noida City Centre – Dwarka Sector 21) – 49.84 (44 Stations)
  • Blue Line#4 (Yamuna Bank – Vaishali) – 8.74 (7 Stations)
  • Green Line#5 (Inderlok  – Mundka) – 15.14 (14 Stations)
  • Green Line#5 (Ashok Park Main – Kirti Nagar) – 3.32 (2 Stations)
  • Violet Line#6 (Kashmere Gate – Escorts Mujesar) – 43.40 (32 Staions)
  • Magenta Line#8 (Botanical Gardan  – Kalkaji Mandir) – 12.64 (9 Stations)
  • Orange LineAirport Express Line (New Delhi – Dwarka Sector 21) – 22.70 (6 Stations)

Operation Route Map (Phase-I, II & III)

Under Construction Lines (Phase-III & IV) – 132.768 km

  • Violet Line #6 Extn. (Badarpur – Ballabhgarh) – 075 (11 Stations) – EDC (June 2018)
  • Gray Line #9 Extn. (Dwarka – Najafgarh) – 4.295 (3 Stations) – EDC (December 2018)
  • Blue Line #3 Extn. (Noida City Centre -Noida Electronic City) – 6.675 (6 Stations) – EDC (March 2018)
  • Green Line #5 Extn. (Mundka – Bahadurgarh City Park) – 11.182 (7 Stations) – EDC (March 2018)
  • Pink Line #7 (Majlis Park – Shiv Vihar) – 58.596 (38 Stations) – EDC (June 2018)
  • Magenta Line #8 (Janakpuri West – Kalakaji Mandir) – 25.595 (16 Stations) – EDC (March 2018)
  • Red Line #1 Extn. (Dilshad Garden – New Bus Adda) – 9.41 (6 Stations) – EDC (June 2018)

Operational Metro Depots

  • Shastri Park Depot (Red Line #1) – 31 Trains
  • Khyber Pass Depot (Yellow Line #2) – 32 Trains
  • Sultanpur Depot (Yellow Line#2) – 28 Trains
  • Najafgarh Depot (Blue Line #3) – 35 Trains
  • Yamuna Bank Depot (Blue Line #3) – 35 Trains
  • Mundka Depot (Green Line#5) – 16 Trains
  • Sarita Vihar Depot (Violet Line #6) – 12 Trains
  • Ajronda Depot (Violet Line #6) – 12 Trains
  • Kalindikunj Depot (Magenta Line #8) – 30 Trains
  • Dwarka Depot (Airport Line) – 7 Trains

Under Construction Metro Depots

  • Mukundpur Depot (Pink Line  #7)
  • Vinod Nagar Depot (Pink Line #7)
  • Samaypur Badli Depot (Yellow Line #2)
  • Bahadurgarh Depot (Green Line #5)

Major Contractors

Contract PackageDescription of workContract Awarded to
MC1ADesign and Construction of civil work and Ventilation& Air Conditioning Work for metro Corridors (Vishwa Vidyalaya ISBT Section)Kumagai  Gumi Co. Ltd.(Japan), Skanska (International Civil Engineering), AB Sweden, Hindustan Construction Co. Ltd. India, Itochu Corporation (Japan)
MC1BDesign and Construction of civil work and Ventilation& Air Conditioning Work for metro Corridors (ISBT – Central secretariat)Dyckerhoff & Windmann AG, Germany, Shimizu Corporation (Japan), Larsen & Turbo Ltd.(India), Samsung Corporation (Korea), IRCON International Ltd. (India)
RS1Design, Manufacture, Supply and Commissioning of Rolling Stock for Metro & Rail corridorsMitsubishi Corporation (Japan), KOROS (Korea), Mitsubishi Electric Corporation (Japan)
SYS1Signaling / Train Control and Communication System for Metro and rail CorridorsAlstom Transport Ltd. (India), Alstom Transport SA (France), Alcatel Portugal SA, Sumitomo Corporation (Japan)
SYS2Traction Power, Power Distribution and SCADA System for Metro CorridorsIRCON International Ltd. (India), Cobra (Spain), ELIOP (Spain)
SYS4Automatic Fare Collection System for Metro Rail CorridorsAlcatel CGA Transport (France)
RC- 7ASupply, Installation, Testing and Commission of Traction Electrification, Power Supply, Power Distribution and SCADA System for Rail CorridorsABB Ltd. (India), Best & Crompton, Engineering Ltd. (India)
RC3Supply, Installation, Testing and Commissioning of ballast less Track for Rail CorridorsIRCON International Ltd. (India), MVM Rail Pty. (Australia)

Rolling Stock Contractors

ContractManufacturerNo of CoachesApp Contract value (INR)
RS1Koros /Hyundai Rotem (South Korea)240+40*1731 Cr.
RS2Bombardier  Transportation Germany340+84*2983 Cr.
RS3Hyundai Rotem South Korea156+40*1384 Cr.
RS4BEML Bangalore6452 Cr.
RS5Bombardier Transportation Germany74+40*811 Cr.
RS6BEML Bangalore136930 Cr.
RS7Bombardier Transportation Germany76545 Cr.
RS9BEML /Hyundai Rotem1621332 Cr.
RS10Hyundai Rotem South Korea486+18*4277 Cr.
RS11Bombardier Transportation India1621500 Cr.
RS13BEML Bangalore96847 Cr.

C