Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
35.1 C
Delhi
Friday, July 19, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

DMRC opened technical bids of Rs. 1365 crores for Phase-4 Project

Date:

Share post:

NEW DELHI, INDIA (Metro Rail News): The Delhi Metro Rail Corporation (DMRC) opened technical bids of Rs. 1365 crores underground tunnel work contract (package DC-07) of Delhi metro phase-4. On 18th August 2021, six multinational construction firms bid to construct a 6.981 KM long tunnel, including three metro stations, about the upcoming Aerocity-Tughlakabad corridor (Silver Line).

SCOPE OF WORK

Design and construction of underground UP and Downs Tunnels by shield TBM from end to cut and cover existing Sarita Vihar depot, underground ramp and cut and cover tunnels near Sangam Vihar and Tughlakabad metro station and underground metro stations at Maa Anandmayee Marg, Railway Colony on Aerocity Tughlakabad corridor of Delhi metro rail project phase-4.

CONTENDERS

  • Larsen & Toubro Ltd. (L&T)
  • ITD Cementation India Ltd.
  • Afcons Infrastructure Ltd.
  • Shanghai Tunnel Engineering Co. (STEC)
  • Hindustan Construction Company-JMC Projects JV

Tenders for the above contract package was invited in May 2021 with the estimated cost of Rs. 1365 crores by DMRC. Now, bids have been sent for technical evaluation, and once the review is completed, DMRC will open the financial bids to announce the name of the lowest bidder of the contact.

The 23.623 KM long silver line (Line 10) will connect Tughlakabad to Aerocity with 15 stations built at Tughlakabad, Railway Colony, Tigri, Khanpur, Vasant Kunj, Delhi Aerocity etc.

Rajat Khanna
Rajat Khannahttp://www.metrorailnews.in
Completed Graduation in Journalism & Mass Communication from IP University, Currently working as an Associate Editor in Metro Rail News.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Mumbai Metro’s Aqua Line to become operational on July 24

Mumbai Metro Line 3 (Aqua Line)Operational Plan of Aqua LineTimingsOperation Management  Mumbai (Metro Rail News): Mumbai’s long-awaited first underground...

Navi Mumbai Metro: 3 Firms Submit Bids to Upgrade AFC System

Navi Mumbai Metro’s Line 1Firms Scope of work  Mumbai (Metro Rail News): After opening technical bids on Tuesday, Maharashtra Metro...

5G Railways, Technology Benefits, Boost to Digital Transformation, Changing Public Transportation

What is 5G?How 5G Works on Trains?5G is Changing the Way We Commute5G Connection Enables Uninterrupted Connectivity5G Enables...

NCRTC provides parking facilities at RRTS stations to promote the use of Public Transport

New Delhi (Metro Rail News): NCRTC is going to provide extensive parking facilities to the commuters of Namo...