Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
31.1 C
Delhi
Thursday, July 25, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Kochi Metro Rail Invites Bids for Consultancy Services for Phase-II Corridor Station Design

Date:

Share post:

KOCHI (Metro Rail News): KMRL has announced an invitation for online bids for consultancy services related to the detailed design of station components for Phase-II corridor of Kochi Metro Rail Project.

The tender reference number is KMRL/PROC/TENDER/2022-23/186, and the EMD (Earnest Money Deposit) required is INR 8.61 Lakh. The period of work is 30 months, and the document download/sale start date is 25th February 2023. The document download/sale end date is 13th March 2023. The pre-bid meeting is scheduled for 2nd March 2023, while the bid submission start date is 6th March 2023, and the bid submission end date is 13th March 2023. The bid opening date is 15th March 2023.

The proposed Phase II corridor of Kochi Metro Rail Project is a fully elevated metro corridor, which is 11.2 km long, and extends from JLN Stadium to Infopark (via Kakkanad) with 11 stations. The newly planned stations in the corridor are Palarivattom Junction, Palarivattom Bypass, Chembumukku, Vazhakkala, Padamughal, Kakkanad Junction, Cochin SEZ, Chittethukara, KINFRA, Infopark I, and Infopark II stations.

As part of the project implementation of Phase II Corridor of Kochi Metro Rail Project from JLN Stadium to Infopark (via Kakkanad), Kochi Metro Rail Ltd. (KMRL) intends to engage a Detailed Design Consultant (DDC) for the detailed design of Civil, Architectural and Building Services (including E&M) components of stations.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...

Kochi Metro: KMRL Proposes New Metro Line From Kalamassery to Tripunithura

Proposed MRTS RoutesKochi MetroPhase 1Phase 2 Kochi (Metro Rail News): On July 22, Kochi Metro Rail Limited released the...

Pune Metro Receives 814 Core boost from budget

Maha Metro Seeks Break-Up Details of Funding Pune (Metro Rail News): On July 23, Union Finance Minister Smt. Nirmala...