Kolkata Metro invites Rs 526 crore bid for New Garia corridor

The tender has been invited for 3.520 km length from ch. 25891.527 to ch. 29410.989 between existing pier cp-760 (near City Centre-II) to merging point with the metro railway at Biman Bandar station yard including two stations (Rabindra Tirtha & VIP ROAD).

1
721
New six coach metro train in Salt Lake depot of Kolkata Metro
New six coach metro train in Salt Lake depot of Kolkata Metro (Photo: KMRC)
Advertisement

Kolkata (Metro Rail News): The Kolkata Metro has invited a bid worth Rs 526.62 crore for construction of viaduct, ramp & underground RCC box (cut & cover, box pushing) including related works.

The tender has been invited for 3.520 km length from ch. 25891.527 to ch. 29410.989 between existing pier cp-760 (near City Centre-II) to merging point with the metro railway at Biman Bandar station yard including two stations (Rabindra Tirtha & VIP ROAD).

The works also include all allied works like architectural, electrical, mechanical, heating, ventilation, air conditioning, fire detection, fire suppression system & public health engineering works in New Garia Bimanbandar Metro Corridor of Kolkata Metro railway line.

“The bid will help to provide pace to the development of Kolkata Metro, ” an official said.

Daily Updates from Metro & Railway

1 COMMENT

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.