Advertisement

Automatic Tarin Control 01

The basic architecture of a fixed block automatic train control (ATC) system with its three main components – ATP (Automatic Train Protection), ATO (Automatic Train Operation) and ATS (Automatic Train Supervision).

image-6
image-7

MOST READ