Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Sunday, September 1, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Four Firms submit bids for Construction of Underground Line of Surat Metro

Date:

Share post:

AHMEDABAD (Metro Rail News): Four firms have submitted 6 tenders (bids) to build 2 underground (tunnel & station work) packages CS2 and CS3 of the 40.35 km Surat Metro Phase 1 project, after the Gujarat Metro Rail Corporation (GMRC) opened technical bids to reveal the bidders.
These civil packages with twin tunnels between Chowk Bazar and Kapodra, in the core of the city, on the 21.61 km Line-1 (Sarthana – Dream City) are 3.46 km and 3.56 km long, and each comprises of 3 cut & cover stations with some Box Pushing and New Austrian Tunneling Method (NATM) work for station connectivity.
GMRC had invited tenders (bids) for both packages in July 2020 with estimates of Rs 929.46 and Rs 942.16 crore respectively and expects the assigned contractor(s) to complete all civil work in 40 months after the contracts are awarded.
The firms which have submitted the bids are Afcons Infrastructure Ltd, Larsen & Toubro Ltd, Gulermak – Sam India Builtwell JV and J Kumar Infraprojects Ltd.
Scope of CS2 includes Design, construction and completion of Underground stations and tunnel including Finishes from Kapodra Ramp to Surat Railway station from chainage 3700m to chainage 7160.6m, comprising twin bored underground tunnel between northern ramp and Surat Railway Metro station, all cut and a cover portion including Three underground stations viz. Kapodra, Labheshwar Chowk and Central Warehouse with entry/exits & connecting subway by Box pushing method and a portion of NATM and Launching and receiving chambers of TBM for Surat Metro Rail Project, Phase-I.

Scope of CS3 includes Design, construction and completion of Underground stations and tunnel including Finishes from Surat Railway station To Chowk Bazar Ramp from chainage 7160.6m to chainage 10720m, comprising twin bored underground tunnel between Surat Railway station and south ramp, all cut and a cover portion including Three underground stations viz. Chowk bazaar, Maskati Hospital and Surat Railway Station with entry/exits & connecting subway by Box pushing method and a portion of NATM and Launching and receiving chambers of TBM for Surat Metro Rail Project, Phase-I.

M K Rai
M K Raihttps://www.metrorailnews.in
M K Rai is a Delhi based Author and Journalist.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Agra Metro Advances with 2 TBM Breakthroughs on Line 1 

Agra (Metro Rail News): Recently, the Agra Metro Phase 1 project witnessed 2 milestones on Line 1 when ...

Chennai Metro’s TBM S81B Achieves Breakthrough at Otteri Station

Chennai ( Metro Rail News): Another day, another achievement. TBM S81 B with the nickname Kolli, commissioned by...

5 Firms Bid For Thane Metro’s DDC-01 Package 

Thane (Metro Rail News): On 29 August, after the opening of technical bids, MMRCL revealed the names of...

MPMRCL MD Inspects Indore Metro from SC-03 to Gandhi Nagar Depot 

Indore (METRO RAIL NEWS): Shri S. Krishna Chaitanya, IAS, Managing Director of Madhya Pradesh Metro Rail Corporation, conducted...