MPMRCL invites bid for construction of 9 Metro Stations on Line 3 of Indore Metro

Date:

Share post:

BHOPAL (Metro Rail News): Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) invites open E-tenders from reputed and experienced contractors for the construction of 9 Elevated Metro Stations on Line 3 (Yellow Line) from MR10 Road Station to Gandhi Nagar Station (10.9 km) of Indore Metro Rail Project.

Routes of Indore Metro
MPMRCL invites bid for construction of 9 Metro Stations on Line 3 of Indore Metro 2

Range of Works

Design and Construction of Elevated Viaduct between Ch.14+488 & Ch.25+415, viaduct connecting Depot leading upto interface location, Nine (9) Elevated Metro Rail Stations including all Civil, Structural, Roof structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural finishes, Façade, Entry/Exits, FOB, Viaduct within the stations including Transition spans” for Indore Metro Rail Project Yellow Line.

Important Details

Tender No: 273/MPMRCL/2021/Package IN-03

Estimated Cost: Rs. 1000 crore

Completion Period: 847 days

Availability of Tender Documents: 10th March to 30th April 2021

Pre-Bid Meeting: 31st March, 2021 at 11:00 hrs

Bid Submission End Date:  22nd April to 30th April 2021 till 16:00 hrs

Technical Bid Opening Date: 01st May 2021 at 16:30 hrs

The 9 stations of Line 3 to be constructed are Gandhi Nagar, Super Corridor 6, Super Corridor 5, Super Corridor 4, Super Corridor 3, Super Corridor 2 and Super Corridor 1, Bhawarsala Square and MR 10 Road along with constructing about 575m depot-line.

The total length of Line 3 will be 33.5 km forming a ring around the city connecting Palasia – Railway Station – Rajwada – Airport – Bhawarsala through 30 elevated stations.

Further Details

For more details, please visit official e-portal – https://etenders.gov.in/eprocure/app.

 For any additional information & help for downloading & uploading, please contact e-tendering service desk at the following ID – [email protected]

Toll Free No.: (91)120-4001002, (91)120-4001005, (91)120-6277787.

Narendra Shah
Narendra Shahhttps://www.metrorailnews.in
Founder and Managing Editor at Metro Rail News - A Symbroj Media Pvt Ltd. Playing Key role in editorial activities & operation.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

RRTS Corridor: Hon’ble Minister Shri Tokhan Sahu Visits Sahibabad-Duhai Section

Delhi-Meerut RRTS Corridor  India’s first Regional Rapid Transit System (RRTS) project is advancing at a rapid pace. Recently, the...

Bhubaneswar Metro: DMRC Invites Bids to Procure 39 Rolling Stock for Line 1

Traction for Rolling StockFeatures of Bhubaneswar MetroKey Points about the ContractThe delivery schedule for the train sets is...

Indian Railway Stations Reimagined: Blending Tradition with Modern Amenities

IntroductionAmrit Bharat Station SchemeMajor Station Development Projects of Indian RailwaysRani Kamlapati Railway Station (Bhopal)Gandhinagar Capital Railway Station (Gujarat)Ayodhya...

Noida Metro: 10 Major Achievements Under Dr Lokesh M.’s First Year as MD

Introduction of Dynamic QR code facility in ToM (Ticket Counter) of NMRC: - Noida Metro's Increased Non-Fare Box Revenue...