Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
33.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

14 Firms bid for Surat Metro Line-2 contracts

Date:

Share post:

SURAT (Metro Rail News): Gujarat Metro Rail Corporation (GMRC) has received bids from 14 companies and consortiums for the construction contracts of Surat Metro’s 19.26 km elevated Line-2 connecting Bhesan – Saroli.

Line-2 of the 40.35 km Surat Metro Phase 1 project consists of 2 packages: 10.559 km CS-5 (Bhesan – Adajan – Majura Gate) with 11 stations and 8.702 km Package CS-6 (Majura Gate – Saroli) with 7 stations.

GMRC had invited tenders for these packages in January and February 2022 through separate loan deals which were signed with Agence Française de Développement (AFD)  and KfW Bankengruppe.

The estimated cost of Package CS5 is Rs. 870 crore for which the technical bids were opened on 5th May, 2022. The bidders who bid for package CS5 are:

  • Ashoka Buildcon Ltd. (ABL)
  • DRA Infracon – RVNL JV
  • GR Infraprojects (GRIL)
  • Larsen & Toubro (L&T)
  • Ranjit Buildcon – Dilip Buildcon (RBL – DBL) JV
  • YFC Projects – KEC International JV

The scope of this package includes Construction of 10.559 Km Elevated Viaduct and 11 Nos. Stations (Excl. E&M, Architectural Finishing and Roofing) From Bheshan Dead End (Ch. -949.63 m) to Majura Gate Station (Ch. 9090m) including Viaduct Ramp to Depot Entry near Bheshan for Surat Metro Rail Project Phase – 1, Corridor-2 (Package 1)

The 11 elevated stations in this package will be built at Bhesan, Botanical Garden, Ugat Vaarigruh, Palanpur Road, LP Savani School, Performing Art Centre, Adajan Gam, Aquarium, Badri Narayan Temple and Athwa Chopati.

The estimated cost of Package CS6 is Rs. 591 crore for which the technical bids were opened on 4th May, 2022. The bidders who bid for package CS6 are:

  • Dineshchandra R Agrawal – Ashoka Buildcon Ltd. JV
  • Dilip Buildcon Ltd. (DBL)
  • Evrascon – Varindera Construction JV
  • HG Infra
  • KEC International
  • Larsen & Toubro (L&T)
  • Rail Vikas Nigam Ltd. (RVNL)
  • Ranjit Buildcon Ltd. (RBL)
  • YFC – MCL (JV)

The scope of this package includes the Construction of 8.702 kms elevated viaduct and 7 nos. stations (Excl. E&M, Architectural Finishing and Roofing) from Majura Gate (Ch. 9090 m) to Saroli Dead End (Ch. 17791.851 m) under Corridor-2 in connection with Surat Metro Rail Project Phase – 1

The 7 elevated stations in this package will be built at Udhna Dawaja, Kamela Darwaja, Anjana Farm, Model Town, Magob, Bharat Cancer Hospital and Saroli.

Abha Rustagi
Abha Rustagihttp://www.metrorailnews.in
Abha Rustagi is working as an Assistant Editor. She has completed her post-graduation from GGSIPU Delhi.

7 COMMENTS

  1. Dev metal Corporation Mumbai
    Steinless steel working in all india
    im intrsted in surat metro ss work
    please contec

  2. HI This is JIGNESH PATEL from JASMINE STEEL FABRICATORS. Pls send us inquiry for structuaral and sheet metal fabrication (ELECTRIC CONTROLL PANEL and many more)job work and supplies as per ur requirement. JIGESH PATEL (9825238240)

  3. hello, sir, I’m Prakash Chauhan from surat gujarat steel working in all of India
    I’m interested in Surat metro work
    please contact for c/z purlin material and I beam supplier 7203880022

  4. Hello, Sir, I’M Bhavesh Rupani Form Surat Gujarat, working all Machining parts. Job work. I’m interested in Surat metro work. Please contact Mo no. 9023898661.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...