Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
34.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

CMRS Inspection Conducted for The Kolkata Metro Green Line’s Howrah Maidan to Esplanade Stretch

Date:

Share post:

KOLKATA (Metro Rail News): Shri Janak Kumar Garg, Chief Commissioner of Railway Safety (CCRS), inspected all the stations from Howrah Maidan to Esplanade of Green Line for the second consecutive day o­n 06.02.2024.  

Need Of Inspection 

He inspected the same stretch of this corridor under the river Hooghly and the tunnels by undertaking a trolley inspection o­n 05.02.2024.  It was a historical moment as CCRS inspection and approval are mandatory and a must for the commissioning and commencement of commercial services o­n this stretch.

The Inspection 

Shri Garg started station inspection o­n this stretch from Howrah Maidan Metro station in the morning.  He travelled by Metro up to Esplanade Metro station under River Hooghly. He inspected the Entry and Exit Gates, AFC-PC Gates, Ticketing System, Based Ticketing System, Station Control Room, Air Conditioning System, Traction Sub-System, Back-Up Control System, Escalators, Lifts, Signage Boards, Fire Detection and Suppression System, Efficiency of Fire Alarms, Emergency Talk Back System, Blue Light System and other passenger amenities provided at each station i.e  Howrah Maidan, Howrah, Mahakaran and Esplanade.

CMRS Inspection of Kolkata Metro 02

Interchanges at Howrah station

At Howrah station, Shri Garg also inspected passenger interchanging points with Eastern Railway and South Eastern Railway as this station will be a junction station of the Kolkata Metro and Eastern and South Eastern Railway network.  Lakhs of passengers are expected to use this station to reach their destinations in the coming days.

CMRS Inspection of Kolkata Metro 03

Signalling & Speed Test 

Later, the CBTC Signalling System was also examined in his presence, and an Anti-Collision Test was also conducted.  A speed Trial was also conducted in the evening, and during this trial, a rake was run at a maximum speed of 91 kmph from Howrah to Esplanade station.  

CMRS Inspection of Kolkata Metro 04

Officials Present 

During this inspection, Shri V.K.Srivastava, Principal Chief Engineer and Additional General Manager (AGM) and other high-level officials of Metro Railway and Kolkata Metro Rail Corporation Limited   (KMRCL)  accompanied him.


Discover the endless possibilities of our city’s Metro at InnoMetro, our flagship Expo and Conference. Be an active participant in shaping its future towards a more sustainable tomorrow. Stay informed and join us to take a step towards a brighter future. 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...