Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Sunday, September 1, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Construction of Agra metro inching toward a goal of attaining world-class metro rail system

Date:

Share post:

AGRA (Metro Rail News): Uttar Pradesh Metro Rail Corporation has shared the aerial view of World class Agra Metro Depot on its Twitter handle. Agra inching closer toward the goal of attaining a world-class metro rail system. World-class Agra Metro Depot is being constructed for the first corridor of Agra Metro.

https://twitter.com/OfficialUPMetro/status/1569685200342519812?s=20&t=Ntg2ry0NgerekSmDuqAANg

The depot will be used for stabling and maintaining the metro trains inside the depot area after day-long operations.
Various structures are being made inside Agra Metro Rail Depot using the PEB Technique (Pre Engineered Building ) Technique which is a modern technique for building various civil structures and uses comparatively lesser time, and effort and is more efficient.

The progress of depot construction is going on at a rapid pace and structures like integrated workshops, auto–coach washing plants and stabling yards are being constructed in the depot for various functions.

A shed above these structures is being built and very soon the work of covering these PEB Structures will be complete. Similarly, test track work inside the depot premises is also complete and a pit wheel lathe machine has also been installed in the depot which will be used to check any malfunctions in the wheel, its alignment, etc.

The first corridor of the Agra Metro Rail Project, which runs from Taj East Gate till Sikandara is 14 km long comprising 13 stations. The work on the second corridor will also be begun very soon.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Agra Metro Advances with 2 TBM Breakthroughs on Line 1 

Agra (Metro Rail News): Recently, the Agra Metro Phase 1 project witnessed 2 milestones on Line 1 when ...

Chennai Metro’s TBM S81B Achieves Breakthrough at Otteri Station

Chennai ( Metro Rail News): Another day, another achievement. TBM S81 B with the nickname Kolli, commissioned by...

5 Firms Bid For Thane Metro’s DDC-01 Package 

Thane (Metro Rail News): On 29 August, after the opening of technical bids, MMRCL revealed the names of...

MPMRCL MD Inspects Indore Metro from SC-03 to Gandhi Nagar Depot 

Indore (METRO RAIL NEWS): Shri S. Krishna Chaitanya, IAS, Managing Director of Madhya Pradesh Metro Rail Corporation, conducted...