Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Delhi Metro takes over operations of Gurgaon Rapid Metro

Date:

Share post:

NEW DELHI (Metro Rail News): The Delhi Metro Rail Corporation (DMRC) has taken over the operations of the Rapid Metro Link, Gurugram from Tuesday night.

Services on the 11.6 km corridor, developed by Rapid Metro Rail Gurgaon Limited (RMGL) and Rapid Metro Rail Gurgaon South Limited (RMGSL), will continue to operate as per the normal time table as earlier. DMRC tweeted “The Delhi Metro Rail Corporation will take over the operations and maintenance of the Rapid Metro Link at Gurugram from tonight, 22 October 2019”.

The earlier concessionaire RMGL had expressed its inability to run the metro in Gurugram due to low footfall and high expenditure. According to the release, the DMRC has provided adequate staff to ensure that the commuters are not affected and the services continue smoothly.

A press release by the DMRC read that DMRC is committed to providing the best possible services. Therefore adequate staff has already been deployed to maintain a smooth and trouble-free transition of service.

DMRC tweeted, with this move, the operational metro network has now become 389 kilometers with 285 stations in total. “With the takeover of operations of Rapid Metro, the total operational metro network Delhi and NCR has now become 389 KM with 285 stations which includes the NOIDA-Greater NOIDA corridor”.

After the takeover of Gurugram Rapid Metro link by Delhi Metro, the stations which will now come under the DMRC include, Sector 55-56, Sector 54 Chowk, Sector 53-54, Sector 42-43, Phase -1, Sikanderpur, Phase-2, Phase-3, Moulsari Avenue, IndusInd Bank Cybercity, Vodafone Velvedere Towers.

The train services on the corridor start at 6 a.m. from Sector 55-56 and Sikenderpur stations with a frequency of 4.30 minutes during morning peak hours and 5.15 minutes during evening peak hours. The last revenue train service departs at 10 p.m. from Sector 55-56.

The rapid metro was constructed by IL&FS Infrastructure in two phases. In the first phase, the company built a 5.1 km elevated track, connecting National Highway No 8 at Shankar Chowk to Sikandarpur DMRC station, covering 6 stations.

Built-in three years at a cost of ₹1,450 crores, the service was opened for public in November 2013.

In another news, for an easy interchange between green and pink lines, the Delhi Metro Rail Corporation (DMRC) is constructing a walkway of 230 meters connecting green lines and pink lines.

Kanika Verma
Kanika Vermahttps://www.metrorailnews.in
Kanika Verma is working with Metro Rail News as Associate Editor and She has done Bachelor in Journalism & Mass Communication (BJMC) from Fairfield Institute of Management & Technology affiliated to Guru Govind Singh Indraprastha University, New Delhi.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...