Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
29.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

DMRC Sumits the DPR for Metro Extension Project From Sector-142 to Botanical Garden 

Date:

Share post:

NEW DELHI (Metro Rail News): NMRC entrusted the work of preparing the DPR of the Metro Extension Corridor from Sector-142 to the Botanical Garden. Accordingly, DMRC had submitted the DPR recently. 

Boost to Connectivity 

This project will provide ease of connectivity to the residents within both the cities of NOIDA & GNIDA and further connect them to the Delhi metro network. Botanical Garden will be an interchanging station between NMRC’s Aqua Line and DMRC’s Magenta & Blue Line. This project will benefit all commuters travelling from Noida- Greater Noida towards Delhi and vice-versa.

Project Highlights: 

  1. Total Length: 11.56 km
  2. Total Stations: 8 Nos of New Elevated Stations
  3. Total Estimated Cost: Rs. 2254.35 Cr.

Proposed Stations 

The proposed stations for the proposed metro line are: 

  1. Botanical Garden 
  2. Noida Sector – 44 
  3. Noida Office 
  4. Noida Sector – 97 
  5. Noida Sector – 105 
  6. Noida Sector – 108 
  7. Noida Sector – 93 
  8. Panchsheel Balak Inter College) 
  9. End – Noida Sector – 142 (Already Existing)

Further Approvals 

NMRC has submitted DPR to NOIDA authority and GNIDA Authority, respectively, to grant In-Principal Approval for DPR. DPR will also be added to the NMRC Board in the next Board Meeting. After that, DPR will be processed for approval of GoUP and GoI. 


Intrigued by the future of Metro and its impact on our city? Join us at our upcoming InnoMetro event to delve deeper into this vital issue. Stay informed, get involved, and let’s ride the Metro towards a brighter, more sustainable future together.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Texmaco Completes Acquisition of Jindal Rail Infra at Rs. 615 Crore

Texmaco's Vision Mumbai (Metro Rail News): On 25 July, Texmaco Rail & Engineering announced that it had acquired a...

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mumbai (Metro Rail News): Mr Anil Kumar Khandelwal, Member...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...