Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Duhai Depot’s administrative building almost ready for India’s first Regional Rail

Date:

Share post:

GHAZIABAD (Metro Rail News): The construction work of the Administrative Building of RRTS being built at Duhai Depot, Ghaziabad has almost been completed for the operation of India’s first Regional Rail. This building will be equipped with the latest technology, along with various modern systems, modern labs, simulator rooms, central work and various equipment rooms.

This building is designed to have multiple rooms/facilities, which include labs for various sophisticated systems such as Automated Fare Collection (AFC) Lab, Platform Screen Door (PSD) Lab, Supervisory Control and Data Acquisition (SCADA) Lab, Telecom Lab etc., and Equipment Rooms Such as Signal Equipment Room and Telecom Equipment Room, IT Server Room, Bridge Management System (BMS) Panel Room etc.

This administrative building will also be equipped with a train simulator room, where information about the operations of the train and its system along with training on how to deal in real-time and real situations will be imparted to the trainees. A lecture hall, conference room and library are also being built here for the trainees and officials. The basement of the building will also have a recreation room and a cafeteria for entertainment and food services.

Duhai Depot is part of the priority section of RRTS that covers an area of ​​17 km from Sahibabad to Duhai in Ghaziabad. Hence, the functioning of Duhai Depot is being expedited for the upcoming operations. The work of laying the RRTS track and installation of OHE at the depot is being completed on a priority basis.

The operational control centre of the RRTS corridor will also be set up at this depot. All the administration work of this depot will be undertaken through this administrative building. One more depot and one stabling yard for RRTS trains are being set up at Modipuram and Jangpura respectively.

The interiors of the Regional rail train coaches featuring its commuter-centric facilities were recently unveiled at the Duhai depot. The coaches will soon be delivered to the depot from Savli in Gujarat. The maintenance and subsequent cleaning facilities of the RRTS trains will be provided at this depot.

NCRTC, through its ambitious RRTS project, endeavours to make the overall experience of the commuters pleasant and enjoyable and encourage people to use public transport.

Abha Rustagi
Abha Rustagihttp://www.metrorailnews.in
Abha Rustagi is working as an Assistant Editor. She has completed her post-graduation from GGSIPU Delhi.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...