Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Hyderabad Metro | PM Narendra Modi inaugurates Metro Train services, opens for public tomorrow

Date:

Share post:

Hyderabad Metro : Prime Minister Narendra Modi Tuesday inaugurated the first phase of the Hyderabad Metro rail project. He then joined Telangana Chief Minister K Chandrasekhar Rao to take part in the inaugural ride from Miyapur to Kukatpally, and back. The first phase of the project, a 30-km stretch between Miyapur and Nagole, will cover 24 stations including Ameerpet and Secunderabad.

first hyderabad metro rail female driver
First women train operators of Hyderabad Metro Rail

The fares are fixed between Rs 10 and Rs 60, and passengers can also avail the smart card facility. The trains would run from 6 am to 10 pm initially and the timings would be rescheduled to 5.30 am to 11 pm, depending on the requirements.

While inauguration of the city’s first metro rail service will happen at 02:15 pm local time, the services will open for public on Wednesday.

“The metro stretch of 30 km, to be thrown open for public, would be the longest in the country on the inauguration,” the Telangana minister KT Rama Rao said.

PM Modi will travel on the ‘Red Line’ along with Telangana Chief Minister K Chandrasekhar Rao from Miyapur to Kukatpally, and back.

hyderabad innogration

Here are five things key points of about the project :

Section of Phase 1 to be operational:

Phase 1 of the Hyderabad Metro Rail project comprises of three sections — Miyapur to L B Nagar (29.87 km), Nagole to Shilparamam (26.51 km) and JBS to MGBS (10.06 km),Only the Miyapur-Nagole stretch will be inaugurated on Tuesday.

Length of the entire system (including Phase 1 and Phase 2) upon completion is expected to be more than 169 kms. Once complete, Phase 1 will have 57 stations.

The service:

Twenty four metro stations would be opened now. The metro train services are scheduled to function from 6 am to 10 pm initially. The timings would be changed to 5.30 am to 11 pm later, depending on traffic and demand.

As many as 57 coaches are ready and available for use with the Hyderabad Metro Rail (HMRL). The rolling stock has been built by Hyundai Rotem in  Changwon, South Korea.

Each train would initially have three coaches which each coach having a capacity to carry 330 people.

Smart Card:

A smart card has been launched for metro passengers. The card would also be used for other modes of transport in future. A mobile app called T Savari is also expected to operationalise.

The Fare:

L&T Metro Rail (Hyderabad) Ltd, the concessionaire, has fixed the minimum fare at Rs 10 for a distance of up to two kilometres. The maximum fare is Rs 60 for a distance of more than 26 kms.

Hyderabad Metro Fare
Hyderabad Metro Rail Fare Chart

Security:

As many as 546 security personnel belonging to private agencies will guard the 24 stations on the Miyapur-Nagole stretch. The personnel will be working under three police officials per station in each shift, according to the Hyderabad Metro Rail Ltd (HMRL).

Sophisticated CCTV cameras have also been installed at all the stations and in trains.

Aradhana Patel
Aradhana Patelhttps://www.metrorailnews.in
She is an Engineering graduate and passionate about writing technical news.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...