Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
33.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

MMRC Finalises The DPR for the Extension of Mumbai Metro Line 3 to Navy Nagar

Date:

Share post:

MUMBAI (Metro Rail News): The Mumbai Metro Rail Corporation (MMRC), as the implementing authority, has finalised a detailed project report (DPR) for extending the Metro 3 underground corridor up to Navy Nagar, Colaba. 

A boon for the Location 

If sanctioned, this extension will provide the corridor with at least four additional stabling lines, complementing those under development in the eco-sensitive Aarey area. Consequently, this expansion will play a vital role in managing the growing capacity demands of the Metro system.

Extension 

The Mumbai metro Line 3 will be extended by 5 Kilometers, 2.5 Kms in each direction, as per the newly prepared DPR by MMRC. The extension has been planned considering the request from the Indian Navy Office to the state government. It was announced by the then Deputy Chief Minister & Finance Minister in the budget speech of 2022-023. 

Advantage 

4 stabling lines at Navy Nagar would mean many will not have to be built at Aarey. It means two trains can be parked at Navy Nagar, apart from Cuffe Parade, which is currently the southern terminus station of Metro 3. 

Planning 

Its planning began with the then government, the MVA government, receiving a request from the Indian Navy office.  The then Maha Vikas Aghadi (MVA) government had considered the proposal to ensure that the concerned location was also roped into the metro chain for better connectivity.  

Commencement 

The project is expected to commence in 2025 after the completion and commencement of commercial operations on Line 3. 

Enhanced Connectivity & Transit Experience 

The proposed extension will benefit the people in the densely populated region. This area includes residential quarters for central government employees and more. It will allow these residents to experience seamless commutation and A-level connectivity across Mumbai. 

Metro Line 3 

The Mumbai metro Line 3 covers 33 km, connecting Colaba to SEEPZ via the Bandra Kurla complex (BKC) and has been divided into 2 phases. 

Phase:01- BKC to SEEPZ

Phase: 02- BKC to Colaba

Phase 1 operation is expected to commence early next year, while phase 2 operations will commence in 2024. MMRC conducted a long-distance train movement last month from MIDC to Vidyanagari and back to SEEPZ. 


Discover the endless possibilities of our city’s Metro at InnoMetro, our flagship Expo and Conference. Be an active participant in shaping its future towards a more sustainable tomorrow. Stay informed and join us to take a step towards a brighter future.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...