Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
33.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

MPMRCL Invites Bids for Indore Metro’s IN-05 Contract Worth Rs 2550 Crore 

Date:

Share post:

INDORE (Metro Rail News): Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) has invited bids for the Package IN-05 of the Indore Metro’s Yellow Line. 

Package IN-05 

The IN-05 underground package, spanning a length of 8.626 kilometres, will link a ramp east of Indore Railway Station to a ramp west of Devi Ahilya Bai Holkar Airport in Indore. The route includes seven underground stations at Indore Railway Station, Rajwada, Chota Ganpati, Bada Ganpati, Ramchandra Nagar, BSF/Kalyani Nagar, and the Airport.

Scope of the Contract 

The scope of the contract ranges from the Design & Construction of a Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without a sump, Ramps, Seven (07) Underground Stations (Indore Railway station, Rajwada, Chota Ganpati, Bada Ganpati, Ramchandra Nagar, BSF/Kalani Nagar and Airport) to Architectural finishing, Plumbing (Water Supply, Sanitary Installation, Drainage facilities and other Plumbing work as directed by the Engineer) works in entire Underground Section for Indore Metro Rail Project.

Key Specifications 

The key specifications of the tender are: 

  • Deadline: 1456 days (4 years)
  • Estimated Cost: Rs. 2550 crore
  • Bid Submission Deadline: April 22, 2024 at 4 PM
  • Technical Bid Opening: April 23, 2024 at 4:30 PM

Alignment of the Package 

The IN-05 Package runs from Indore railway Station to the Airport. To the east, it will link up with Package IN-04, secured by RVNL – URCC JV in December 2023. To the west, connectivity will extend to Package IN-03, which is currently being constructed by URCC through a subcontract from RVNL since 2021.

Finances 

This contract is set to be financed through a pending approval by the Asian Development Bank (ADB) for a USD 225 million loan.

Status on Yellow Line, Indore Metro 

This marks the sixth and ultimate civil package from Yellow Line to advance to the bidding stage.


Discover the endless possibilities of our city’s Metro at InnoMetro, our flagship Expo and Conference. Be an active participant in shaping its future towards a more sustainable tomorrow. Stay informed and join us to take a step towards a brighter future. 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Texmaco Completes Acquisition of Jindal Rail Infra at Rs. 615 Crore

Texmaco's Vision On 25 July, Texmaco Rail & Engineering announced that it had acquired a 100% stake in Jindal...

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...