Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Sunday, September 1, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

NCRTC to install five entry/exit gates at Ghaziabad RRTS station

Date:

Share post:

GHAZIABAD (Metro Rail News): Ghaziabad will be the most important and busiest station on the Delhi-Meerut Rapid Rail Corridor. A maximum of five entry-exit gates are being installed here. In addition, stations will be connected directly through three-gate foot overbridges. The rapid rail trial run between Sahibabad and Duhai depot is expected to start within the next week. Preparations regarding this are going on in the final stage.

Ghaziabad’s rapid rail station will be one of the busiest stations. There are many reasons for this. At some distance from the station, there is a new bus stand in Ghaziabad, from where buses are available for many cities of western Uttar Pradesh. The Delhi Metro station is just a few steps away. While there is Mahamaya Stadium in front of the Rapid Rail Station, where players come from far-off places. The rapid rail station will also be connected to the bus and metro station in such a situation.

Ghaziabad’s RRTS station is entirely elevated, i.e. built on the pillar. It is being built between three roads of Meerut Tiraha turn and Ghaziabad-Meerut road. Due to the location, it will be one of the busiest stations. Due to being a busy station, NCRTC has given entry-exit gates on all three sides of this station so that no one has any problem with movement.

On the road on which this station is being built, there is heavy traffic every second. Therefore, passengers can use the entry-exit gate of this station to cross the road. These three gates will be connected to the station through foot overbridges. The foot overbridge will have lifts and accelerators. One gate is being constructed at Chaudhary Charan Singh Park on the Delhi-Ghaziabad road, the second gate towards Arya Nagar and the third gate towards Patel Nagar.

This station will also provide transportation facilities to people living in other areas of Ghaziabad, including Sevanagar, Bhim Nagar, Hindon Vihar, Mukundpur, Madhopur, Islamnagar, Kaila Khera, Jassipura, Brahampuri and Lohia Nagar. This station’s entry/exit gates will also have ramps and tactile paths to ensure seamless and accessible travel for physically challenged and visually impaired passengers.

 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Agra Metro Advances with 2 TBM Breakthroughs on Line 1 

Agra (Metro Rail News): Recently, the Agra Metro Phase 1 project witnessed 2 milestones on Line 1 when ...

Chennai Metro’s TBM S81B Achieves Breakthrough at Otteri Station

Chennai ( Metro Rail News): Another day, another achievement. TBM S81 B with the nickname Kolli, commissioned by...

5 Firms Bid For Thane Metro’s DDC-01 Package 

Thane (Metro Rail News): On 29 August, after the opening of technical bids, MMRCL revealed the names of...

MPMRCL MD Inspects Indore Metro from SC-03 to Gandhi Nagar Depot 

Indore (METRO RAIL NEWS): Shri S. Krishna Chaitanya, IAS, Managing Director of Madhya Pradesh Metro Rail Corporation, conducted...