INDORE (Metro Rail News): Rail Vikas Nigam Limited (RVNL) announced in its regulatory filing on March 9 that it has received an order from the Madhya Pradesh Metro Rail Corporation.
Scope of the Contract
The contract’s scope includes the design and construction of an elevated viaduct, five elevated metro stations, and a ramp. The stations are: Shaheed Bagh, Khajrana Chauraha, Bengali Chauraha, Patrakar Colony & Palasaia Chauraha.
Specifications
The specifications of the contract are as follows:
- Value: Rs 543 Crore
- Duration: 1092 days
Indore Metro is a mass rapid transit system that MPMRCL built. Phase 01 of the Indore metro is being built at an estimated cost of Rs. 7500 Crores. The metro trains will run 80 km/hr across the 31.5 Km line in Indore with 29 stations.
Intrigued by the future of Metro and its impact on our city? Join us at our upcoming InnoMetro event to delve deeper into this vital issue. Stay informed, get involved, and let’s ride the Metro towards a brighter, more sustainable future together.