Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Shri Ashwini Vaishnaw, Minister of Railways inspects Amrit Bharat trains Rake at New Delhi Station

Date:

Share post:

DELHI (Metro Rail News): Hon’ble Minister of Railways, Communications and Electronics & Information Technology, Shri Ashwini Vaishnaw inspected the Amrit Bharat train rake at New Delhi railway station today. Shri Vaishnaw appreciated the technology used in the newly built Amrit Bharat trains for ensuring maximum comfort to the travelling public. 

Shri Ashwini Vaishnaw inspected the Amrit Bharat train rake at New Delhi railway station

Amrit Bharat train is ready based o­n the push –pull technology. Speaking o­n the occasion Shri Vaishnaw said that it has two locomotives (one at front and o­ne at rear). Railways have tried to make the travel experience better for the passengers who used non AC coaches.  Amrit Bharat trains will be flagged off by Hon’ble PM Modi very soon.

The Amrit Bharat train is a push pull train for the common man. The new train has a locomotive at each end for a “push-pull” operation which allows for faster acceleration, hence resulting in travel time being reduced. The new train from Indian Railways has several new features keeping in mind the comfort of the common man.

The non A.C. train will have twenty two coaches with 12 Second Class 3- Tier Sleeper Class, 08 General Second Class coaches and two Guard Compartments. In the Guard compartment, there is a space for ladies in o­ne and Differently Abled passengers in another coach.

Some of the important features of the train includes:

  • Aerodynamically designed WAPS Locomotives o­n both ends with push pull configuration (Concentrated Power Train Set).
  • Jerk free semi-permanent couplers. Passengers can enjoy jerk free journey now.
  • Maximum permissible speed of 130kmph (speed potential)∙ 
  • Control couplers o­n end walls for push pull operation with locos at both ends of the train.
  • Improved design light with foldable snack table.
  • Fully sealed gangways.
  • Mobile charger with suitable holder and foldable bottle holder.
  • Aesthetically pleasing and ergonomically designed seats and berth with improved color blending.
  • Improved cushioned luggage rack.
  • Zero discharge (FRP) modular toilets.
  • Aerosol based fire suppression system in toilets and electrical cubicles.
  • Radium illumination flooring strip.
  • Faster acceleration for reduced travel time.
Narendra Shah
Narendra Shahhttps://www.metrorailnews.in
Founder and Managing Editor at Metro Rail News - A Symbroj Media Pvt Ltd. Playing Key role in editorial activities & operation.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...