Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
33.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

100% contract placed for civil, track work on Gujarat area of MAHSR project: Railway Minister

Date:

Share post:

NEW DELHI (Metro Rail News): All civil and track work contracts for the 352-km stretch of the bullet train project on the Gujarat side have now been awarded from which Rs 3,141-crore worth track contract has been given to Larsen and Toubro, Railway Minister Ashwini Vaishnaw said on Saturday, 30th April.

“BulletTrainProject NHSRCL contracts for track work worth Rs. 3,141 Cr awarded. 100 per cent contract placed for civil and track work in Gujarat area,” Railway Minister Ashwini Vaishnaw tweeted.

A statement from the National High-Speed Rail Corporation Limited (NHSRCL) said the ballast-less slab track system as used in the Japanese HSR (Shinkansen) will be deployed in India’s first High-Speed Rail project.

Japan Railway Track Consultant Co. Limited (JRTC) has provided the detailed design and drawing of major HSR track components like RC track bed, track slab arrangement, and continuous welded rail (CWR) forces for the contract, the statement said.

This contract to L&T is the second one for the design, supply, and construction of the track and track-related works for the Mumbai Ahmedabad High-Speed Rail corridor.

“National High-Speed Rail Corporation Limited awards second contract (related to track works) for supply and construction of the track and track-related works for Double Line High-Speed Railway between Vadodara and Sabarmati Depot and Workshop in the State of Gujarat (MAHSR T-3 Package) to M/S Larsen & Toubro Limited at a total approximate cost of INR 3141 Cr,” a statement from NHSRCL said.

Abha Rustagi
Abha Rustagihttp://www.metrorailnews.in
Abha Rustagi is working as an Assistant Editor. She has completed her post-graduation from GGSIPU Delhi.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...