Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Sunday, September 1, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Bengaluru Metro much-awaited flyover near KR Puram received a significant fillip

Date:

Share post:

BENGALURU (Metro Rail News): A much-awaited Byappanahalli to Whitefield corridor with a distance of 15km has received a significant fillip with Bangalore Metro Rail Co Ltd performing work on the viaduct crossing over B B Naranayapura flyover near KR Puram.

According to BMRCL officials, they have launched the viaduct among proposed KR Puram & Mahadevapura stations on 4th of June.

Where B Naranayapura flyover is 10.7 meter from the ground level, the elevated viaduct is 20.7 meter. This means the viaduct is 10 meters above the flyover stated BL Yeshwanth Chavan BMRCL chief public relations officer also added that the length of the Metro’s span over the flyover is 31 meter.

piers average height on the Byappanahalli to Whitefield section is around 10 to 11 meter as it increases at the stations and decreases at other sections. The earlier deadline of the section was August 2021, it’s expected to be postponed because of lockdown.

work on the line under Namma Metro’s Phase 2 is executing by ITD Cementation India Ltd. Bengaluru Metro records reveal 65% of civil works have been finished among Byappanahalli -Visvesvaraya Industrial Area & 78% among Visvesvaraya Industrial Area – Whitefield.

Neha Singh
Neha Singhhttps://www.metrorailnews.in
Neha Singh is working as an Editor at Metro Rail News. She has vast experience and passionate about writing news and Article on Technology, Urban Mobility.

7 COMMENTS

  1. Send me your email address,I will send the email sent out where KR Puram lowry land is been objected.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Agra Metro Advances with 2 TBM Breakthroughs on Line 1 

Agra (Metro Rail News): Recently, the Agra Metro Phase 1 project witnessed 2 milestones on Line 1 when ...

Chennai Metro’s TBM S81B Achieves Breakthrough at Otteri Station

Chennai ( Metro Rail News): Another day, another achievement. TBM S81 B with the nickname Kolli, commissioned by...

5 Firms Bid For Thane Metro’s DDC-01 Package 

Thane (Metro Rail News): On 29 August, after the opening of technical bids, MMRCL revealed the names of...

MPMRCL MD Inspects Indore Metro from SC-03 to Gandhi Nagar Depot 

Indore (METRO RAIL NEWS): Shri S. Krishna Chaitanya, IAS, Managing Director of Madhya Pradesh Metro Rail Corporation, conducted...