Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Sunday, September 1, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Delhi Metro | DMRC appoints Daljeet Singh as Director (Works)

Date:

Share post:

New Delhi: The Delhi Metro Rail Corporation (DMRC) has appointed Mr. Daljeet Singh as Director (Works). The post was lying vacant after resignation of former Director Mr. Jitender Tyagi who took charge of Uttarakhand Metro Rail Corporation (UMRC).

Daljeet Singh DW
Mr. Daljeet Singh, Director (Works), Delhi Metro Rail Corporation

Mr. Singh is a civil engineer who did his B.Tech from I.I.T. (BHU) Varanasi and M.Tech. from I.I.T. Kanpur . He joined CPWD in 1988 through Indian Engineering Services (IES) exam and was posted in various wings of CPWD. He also worked with DMRC from 1998 to 2014 and held various roles and position.

In DMRC, he was involved in the construction of first Delhi Underground Metro Corridor from Central Secretariat to Vishwavidyalaya (11 Km) of Phase-I during 1998-2004.  He was also involved in the construction of I.T. Park buildings as a part of DMRC Property Development and ‘Metro Bhawan’, the Headquarter building of DMRC.  He was involved in the design and construction of 15 Km Elevated Corridor from Qutab Minar to HUDA City Centre under Phase-II, design and construction of 13 Km Underground Metro Corridor from Kalkaji to Vasant Vihar under Phase-III of Delhi Project.

Mr. Singh, before assuming charge as Director (Works) of DMRC, was working as Director (Works & Infrastructure) in Lucknow Metro  and  was involved in the planning, design and construction of 23Km of North-South Corridor of Phase IA of Lucknow Metro Project. He was instrumental in commissioning of Priority corridor of 8.5 km in less than three years.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Agra Metro Advances with 2 TBM Breakthroughs on Line 1 

Agra (Metro Rail News): Recently, the Agra Metro Phase 1 project witnessed 2 milestones on Line 1 when ...

Chennai Metro’s TBM S81B Achieves Breakthrough at Otteri Station

Chennai ( Metro Rail News): Another day, another achievement. TBM S81 B with the nickname Kolli, commissioned by...

5 Firms Bid For Thane Metro’s DDC-01 Package 

Thane (Metro Rail News): On 29 August, after the opening of technical bids, MMRCL revealed the names of...

MPMRCL MD Inspects Indore Metro from SC-03 to Gandhi Nagar Depot 

Indore (METRO RAIL NEWS): Shri S. Krishna Chaitanya, IAS, Managing Director of Madhya Pradesh Metro Rail Corporation, conducted...