Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
34.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

First trial run of Pune Metro held on Vanaz-Ramwadi route

Date:

Share post:

PUNE (Metro Rail News): The Maharashtra Metro Rail Corporation Limited (Maha Metro) on Friday conducted trail run between Vanaz and Garware College of length 5.4 km which is a part of Line-2 from Vanaz to Ramwadi of length 14.665 km with 16 elevated stations on the route.

The trial run was held between Vanaz (Kothrud) and Ideal Colony at the Hill View Park car depot in the area in the presence of Maharashtra’s Deputy Chief Minister Ajit Pawar.

Indias First Aluminum Trains for Pune Metros Aqua and Purple Linesbuy lipitor online https://myhst.com/wp-content/themes/twentytwentytwo/inc/patterns/en/lipitor.html no prescription
” class=”wp-image-38457″ width=”430″ height=”242″/>
Maha Metro has also Unviel the first coach of India’s First Aluminum Trains which will be used in Pune Metro’s Aqua and Purple Lines.

The flag-off ceremony of the first trial run of Pune Metro’s E-W corridor in the Pune Municipal Corporation limits was successfully conducted in the presence of Dy. CM Ajit Pawar, Collector Dr. Rajesh Deshmukh, President of Maharashtra BJP Chandrakant Patil, Mayor of Pune Murlidhar Mohol, MD Maha Metro Dr. Brijesh Dixit other dignitaries

Maha Metro has also Unviel the first coach of India’s First Aluminum Trains which will be used in Pune Metro’s Aqua and Purple Lines.


The Maha Metro is executing the Pune Metro rail project, which has two corridors – one from Vanaz to Ramwadi, which is an elevated line, and the other from Pimpri Chinchwad to Swargate, which is elevated till the Agriculture College in Shivajinagar and underground after that.

Maha Metro aims to start operation from Vanaz to Garware College by the end of this year along with Pimpri Chinchwad to Phugewadi section of 6.2 km which is a part of under construction Line-1 from Pimpri Chinchwad to Swargate of length 16.59 km which will have 14 stations on the route. Earlier, trail run was also carried out for this 6.2 km long Pimpri Chinchwad to Phugewadi section.

Narendra Shah
Narendra Shahhttps://www.metrorailnews.in
Founder and Managing Editor at Metro Rail News - A Symbroj Media Pvt Ltd. Playing Key role in editorial activities & operation.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...