Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
34.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

MMRDA Reinvites Bids for Package C-240 of Mumbai Metro Line-12 

Date:

Share post:

MUMBAI (Metro Rail News): Mumbai Metropolitan Region Development Authority (MMRDA) has invited bids for the civil construction work of the Mumbai Metro’s Orange Line. 

Package C-240

Package C-240 has been formed by amalgamating two packages, CA-185 & CA-186, of Civil construction for which bids were invited further; the tendering process was cancelled in June due to a change of Scope. 

Metro Line 12 

It’s a 22.17 Km long southern elevated section of the under-construction of the 24.9 Km Line 5 at an estimated cost of Rs 4,132 Crore. 

Key Details

The critical details of the tender are: 

  1. Bid Opening Date: January 29 at 11 am
  2. Estimate: Rs. 1877.88 crore
  3. Period of Work: 30 months
  4. Pre-Bid Meeting: January 3, 2024 at 11 am
  5. Bid Submission End Date: January 25, 2024 at 5 pm

Scope of the Contract 

The contract includes Part design and construction of an elevated viaduct and 19 elevated stations, including a connecting line from Vadavli (khu) to the depot of line 12, excluding architectural finishing & pre-engineered steel roof structure of stations. 

Stations on the Line 

The 19 stations on the line are: 

Kalyan, APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavli, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilje Gaon, Vadavli (khu), Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Amandoot.  

One of the Longest  

The package will be one of the most extended packages of civil construction only after Hyderabad Metro’s 31 Km Airport Line that reaims in doll drum as the new government takes over the charge. 


Intrigued by the future of Metro and its impact on our city? Join us at our upcoming InnoMetro event to delve deeper into this vital issue. Stay informed, get involved, and let’s ride the Metro towards a brighter, more sustainable future together.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...