Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
34.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Mumbai Metro | MMRDA invites bids for supply of fire detection systems, E&M and DG sets for Line-7

Date:

Share post:

Mumbai: The Mumbai Metropolitan Region Development Authority (MMRDA) invites global tenders for Design Verification, Supply, Installation, Testing and Commissioning of E&M, Fire Detection and Fire Suppression Systems including DG Sets of 13 Elevated Stations (Andheri East To Ovaripada) of Mumbai Metro Line 7 (Andheri East to Dahisar East) of Mumbai Metro Rail Project of MMRDA.

Contract No. and Title: MMRDA/7/MMRP/CA-17: Design Verification, Supply, Installation, Testing and Commissioning of E&M, Fire Detection and Fire Suppression Systems including DG Sets of 13 Elevated Stations (Andheri East To Ovaripada) of Line 7 (Andheri East to Dahisar East) of Mumbai Metro Rail Project of MMRDA.

Key Points of Tender Notice No. MMRDA/7/MMRP/CA-17:

  • Approximate Cost of Project: INR 56.06 crores 
  • Completion period of the Work: Fourteen (14) months
  • Tender documents on sale: From 15.06.2018 to 30.07.2018 (up to 1200 hrs) on e-tendering portal of MMRDA. https://etendermmrda.maharashtra.gov.in
  • Cost of Tender documents: INR 11,200/-
  • Pre-bid Meeting: 04.07.2018 at 11:00 hrs.
  • Date & time of Submission of Tender online: 30.07.2018 up to 15:00 hrs
  • Date & time of Tender Closing: From 30.07.2018 (1501 Hrs) to 30.07.2018 (up to 1800 hrs)
  • Date & time of opening of Tender online: 31.07.2018 at 14:00 hrs.
  • Authority for purchase of tender documents, seeking clarifications and submission of completed tender documents: Director (System)-Metro PIU, 1st Floor, A-wing, Old Administrative Building, Mumbai Metropolitan Region Development Authority (MMRDA),
    Bandra Kurla Complex, Bandra (E), Mumbai – 400051
    Phone: 91(22) 26597552, Fax: 91(22)26594182
    E-mail: [email protected]
    https://mmrda.maharashtra.gov.in

About Mumbai Metro Line-7 (Andheri East – Dahisar East) Corridor:

  • This corridor will cover approx. 16.5 km long distance from Andheri East to Dahisar East and consist with 13 elevated metro stations.
  • This corridor will provide inter-connectivity among the existing Western Express Highway, Western Railway, Mumbai Metro Line 1 (Ghatkopar to Versova), the ongoing Metro Line 2A (Dahisar to DN Nagar) and the proposed Metro Line 6 (Swami Samarth Nagar to Vikhroli).
  • This corridor will facilitate smooth and efficient interchange with the suburban rail system and MRT system at Andheri, JVLR and Dahisar
  • This corridor will provide connectivity between Central Mumbai and Northern suburban Mumbai. It will also provide rail based access to the Mumbai International Airport (CSIA), SEEPZ, National Park and other commercial and geographical landmarks.
  • A dedicated Depot is planned at Dahisar.

Source: MMRDA website

Mamta Shah
Mamta Shahhttps://www.metrorailnews.in
Mrs. Mamta Shah is Managing Editor of Metro Rail News. She is one of among the team of Founder Directors of the Symbroj Media Pvt. Ltd.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Indian Railways Intends to Launch 50 Hydrogen Trains by 2047

Indian Railways' Plans for Kavach IVRailways' Share in Freight Transportation Mr. Anil Kumar Khandelwal, Member (Infrastructure) of the Railway...

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...