Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
30.1 C
Delhi
Saturday, July 27, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Pune Metro Rails arrives from Siberia

Date:

Share post:

PUNE (Metro Rail News): The first freight carrying rails which were meant for Pune Metro arrived in the city today. The head – hardened rails of UIC60 E1, 1080 Grade with 25m and 18m are used. They were unloaded at kharalwadi.

the Pune Metro Rail Project requires (reach 1 & 2) is 9,000 metric tonnes. Process of laying the rails on the 4.5km elevated stretch that is ready and will now begin. The rail has arrived from the Siberia Workshop of Swiss-based East Metals AG.

 MAHA Metro, a SPV (Special Purpose Vehicle) of Government of India and Government of Maharashtra has undertaken the Pune Metro Rail project. Metro rail track will run from PCMC Building in Pimpri to Swargate. The 16.59-km line will be elevated till Range Hills with 9 stations and will further go underground up to Swargate with 5 stations.

Metro line track will run from Pimpri Chichwad Municipal Corporation (PCMC) Building in Pimpri to Swargate.  The 16.59- km line will be lifted up till Range Hills with 9 stations and will further go underground up to Swargate with 5 stations. The MAHA Metro, a Special Purpose Vehicle (SPV)of government of India and Government of Maharashtra has undertaken the Pune Metro project.

Sona Sagar
Sona Sagarhttp://www.metrorailnews.in
Sona Sagar is an editorial intern with Metro Rail News.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Wabtec Expands Locomotive Services as Gooty Maintenance Shed Starts Operations

Wabtec's Role  Andhra Pradesh (Metro Rail News): Wabtec Corporation (NYSE: WAB) and Indian Railways celebrated the start of locomotive...

Tricity Metro to Feature New Extensions of 6.15 km

Initial Plan for Tricity Metro: Chandigarh (Metro Rail News): Amidst all the delays, the Tricity Metro Project has progressed...

Digital twin: Helping sustainability goals and smart rail operations within reach  

A digital twin is an artificially generated and virtual representation of an object or system that spans its lifecycle, is...

Mumbai Metro: Leena Becomes L1 for Electrification Contract of Line 7A & Line 9

Mumbai Metro’s Line 7A and Line 9Line 7A: Line 9:Bidding ProcessFinancial Bids Scope of workUpdate on Line 7A and Line...